The system
What sits against what, from the substrate outwards. Junctions, movement joints and edge details are project-specific — send us the drawings and we will mark them up.
Microtadelakt on a prepared mineral base
Grain sizes are selected by coat: Base for build, Regular or Medium for the finish, Fine for the closest work.
Performance data
Taken from the manufacturers' own technical data sheets, with the standard each figure was measured against. Product-level figures are on the product pages below.
| Property | Result | Standard |
|---|---|---|
| Applied thickness | 1 – 4 mm | Cemher data sheet |
| Emissions into indoor air | A+ | UNI EN ISO 16000-6:2019 / UNE EN 16516:2018 |
| Thermal conductivity | 0.46 W/mK | UNI EN 12664:2002 |
| Reaction to fire | Class A1 / A1FL | UNE EN 13501-1:2019 |
| Adhesion strength | > 4 N/mm², Class B 4.0 | UNI EN 13892-8:2003 / UNE EN 13813:2014 |
| Impact resistance | > 18.5 Nm, IR 18 | UNI EN 6272-2:2012 |
| Surface hardness | > 200 N/mm², SH 200 | UNI EN 13892-6:2003 |
| Compressive strength | > 40 N/mm², Class C40 | UNI EN 13892-2:2005 |
| Abrasion resistance (BCA) | Class AR 0.5, max 50 µm | UNI EN 13892-4:2003 |
| Water penetration under pressure | 5 bar, 3 days — no penetration | UNE EN 14891:2017 / UNI EN 12390-8:2020 |
| Slip resistance | USRV 41, Class 2 | UNE EN 12633:2003 |
| Permeability to liquid water | < 0.1 kg/(m²·h^0.5), Class II | UNE EN ISO 1062-3:2008 |
| Water vapour transmission | Class 1, Sd < 5 m | UNE EN ISO 7783-2:2012 |
| Workability at 20 °C | Approx. 120 minutes; pot life 3 hours | Cemher data sheet |
| Minimum application temperature | + 10 °C | Cemher data sheet |
| Shelf life | 24 months from manufacture, stored 10 – 30 °C, dry and ventilated | Cemher data sheet |
Products in this family
One page per technical data sheet. Each carries the manufacturer's declared figures, the limits, a specification clause and the full document set.
Where not to use it
Specifying a material into the wrong place is the most expensive mistake on a finishes package. These are the limits we will raise at review whether or not they are asked about.
- Values marked as tested without sealer. The sealed system performs differently and the sealer has its own data sheet.
- Do not apply below 10 °C. Low temperatures extend, and high temperatures shorten, pot life and drying.
- Suitable over hot water underfloor heating; not over electric underfloor heating.
- pH 12 after one day. Rubber gloves and eye protection during application.
- Tadelakt in wet areas is not fully impermeable and needs re-soaping every one to two months to keep its water repellency.
- Not acid resistant. Citrus, wine, vinegar and household cleaners will damage the surface.
Lime plaster: Cemher Microtadelakt one-component lime plaster in colour [ref], applied 1–4 mm in [number] coats over two coats of Microtadelakt Base on the prepared substrate, finished [tadelakt / marmarino / polished plaster] to the approved sample panel. Primer 100 adhesion promoter to all substrates. Reaction to fire Class A1 to UNE EN 13501-1:2019. Sealed with [Aquamax / Maxipur] not less than 24 hours after hardening and below 5% substrate moisture. Supply and application by Conmarble Natural Finishes.
Square brackets mark the choices that belong to the project. Send us the finishes schedule and we will return the clause completed, with the sample and mock-up programme against it.
Document library
Every publishable document for this family, reproduced in full and unaltered under our cover. Free to download, no form.
-
MICROTADELAKT Lime plaster · Colour & range sheet · 10 pp · 1.8 MBDownload (PDF, 1.8 MB)
-
Microtadelakt — four grain sizes Lime plaster · Technical data sheet · 6 pp · 0.9 MBDownload (PDF, 0.9 MB)
-
Microtadelakt — four grain sizes Lime plaster · Technical data sheet · 5 pp · 1 MBDownload (PDF, 1.0 MB)
-
Microtadelakt — four grain sizes Lime plaster · Technical data sheet · 5 pp · 0.9 MBDownload (PDF, 0.9 MB)
-
CEMHER HYDROPRIMER Lime plaster · Voc content test report · issued by Applus Laboratories / LGAI Technological Center S.A. — DANAK-accredited lab reg. 522 · 5 pp · 4.9 MBDownload (PDF, 4.9 MB)
-
CEMHER HYDROPRIMER Lime plaster · Voc emissions & content certificate · issued by Applus Laboratories / LGAI Technological Center S.A. — DANAK-accredited lab reg. 522 · 9 pp · 5.4 MBDownload (PDF, 5.4 MB)
-
CEMHER HYDROPRIMER Lime plaster · Voc emissions certificate · issued by Applus Laboratories / LGAI Technological Center S.A. — DANAK-accredited lab reg. 522 · 2 pp · 0.8 MBDownload (PDF, 0.8 MB)
-
CEMHER HYDROPRIMER Lime plaster · Attestation · issued by Applus Laboratories / LGAI Technological Center S.A. — DANAK-accredited lab reg. 522 · 3 pp · 0.9 MBDownload (PDF, 0.9 MB)
-
CEMHER HYDROPRIMER Lime plaster · Voc content certificate · issued by Applus Laboratories / LGAI Technological Center S.A. — DANAK-accredited lab reg. 522 · 2 pp · 0.9 MBDownload (PDF, 0.9 MB)
-
CEMHER HYDROPRIMER Lime plaster · Leed v4.1 contribution attestation · issued by Applus Laboratories / LGAI Technological Center S.A. — DANAK-accredited lab reg. 522 · 2 pp · 0.8 MBDownload (PDF, 0.8 MB)
-
CEMHER MICROTADELAKT Lime plaster · Voc emissions test report · 23 pp · 3.9 MBDownload (PDF, 3.9 MB)
-
CEMHER MICROTADELAKT Lime plaster · Voc emissions certificate · issued by Applus Laboratories / LGAI Technological Center S.A. — DANAK-accredited lab reg. 522 · 2 pp · 0.8 MBDownload (PDF, 0.8 MB)
-
CEMHER MICROTADELAKT Lime plaster · Voc content certificate · issued by Applus Laboratories / LGAI Technological Center S.A. — DANAK-accredited lab reg. 522 · 2 pp · 0.9 MBDownload (PDF, 0.9 MB)
-
CEMHER MICROTADELAKT Lime plaster · Safety data sheet · 14 pp · 0.9 MBDownload (PDF, 0.9 MB)
Featured projects
Built with this material, by our own artisans. Open the project for the full set of photographs and the story of the installation.
Related systems
Technical support for the design team
We supply the material and we apply it, so the specification and the workmanship sit with one party. Send a finishes schedule, an elevation or a mood board and we will come back with the system, the build-up, the sample programme and a completed clause.

